2009/12/8 20:28:17

acceptance check

A new chiller  was arrive today, our manager Andy who done the acceptance check was so circumspect. At first, he will see the whole appearance design, if it is not good look or inconvenient, he will ask the supplier take it back and redesign again. Last time was a proof. But the most important thing is the power and the flowrate. He will check all the quotation spec, even the inside little part, and then the less important part like water pipe, door etc.

I think no matter what it is, it will just has a rule, if we follow a right procedure, all will be done well!

Keep going.........



下一篇:2009
上一篇:Get marry

评论

您还未登录,不能对文章发表评论!请先登录